MEES and Commercial EPCs: What Landlords Need to Plan For Before the Next Deadline
Commercial Property

MEES and Commercial EPCs: What Landlords Need to Plan For Before the Next Deadline

5 November 2026·8 min read
Commercial Property Guide

Reviewed and signed off by Lyman Marshall Surveyors, Director, Surveyor and RICS Registered Valuer at Lyman Marshall Chartered Surveyors. Published 5 November 2026 · Updated 5 November 2026

If you are a commercial landlord planning around an EPC C deadline in 2027, you are planning around a milestone that no longer exists. In an interim response published on 18 June 2026, the government confirmed that the previously proposed interim EPC C milestone for 2027 will not be taken forward.

That single change rewrites most of the MEES advice still circulating online. It does not, however, mean landlords can stop thinking about this — because the standard that already applies has been in force since 2023, and the next one is now aimed squarely at larger buildings.

Quick answer: The MEES commercial property rules require privately rented non-domestic buildings in England and Wales to reach at least EPC E. Since 1 April 2023 that applies to all existing lettings, not just new ones. The government has confirmed its intention that from 2031 buildings over 1,000 square metres must reach EPC B where cost effective, while smaller buildings stay at E.

What the MEES commercial property rules require right now

The Energy Efficiency (Private Rented Property) (England and Wales) Regulations 2015 set the minimum standard. The dates that matter have already passed.

From 1 April 2018, landlords could only grant, extend or renew a tenancy on a non-domestic property rated at least EPC E, unless a valid exemption was registered. From 1 April 2023, the government’s guidance confirms, the requirement applies to all privately rented non-domestic properties, even where there has been no change in tenancy.

That second date is the one landlords underestimate. A building let on a long lease signed in 2015, with no renewal since and no plans for one, is still caught. Continuing to let it below E without a registered exemption is a breach now, not a future problem.

Which properties are in scope

The regulations apply to non-domestic rented property that is legally required to have an EPC. They do not apply where the tenancy is granted for a term certain of six months or less, subject to conditions, or for a term certain of 99 years or more.

There is also a broader point worth checking before anything else: a property only needs an EPC in defined circumstances. GOV.UK sets out that you must have one if you rent out or sell the premises, when a building under construction is finished, or when changes to the number of separately occupied parts involve providing or extending fixed heating, air conditioning or mechanical ventilation.

Vacant commercial premises being assessed against MEES minimum energy efficiency standards

The deadline that replaced 2027 and 2030

Here is where most published guidance is now out of date, including a good deal of it written by people who should be keeping up.

The 2020 Energy White Paper confirmed a future trajectory of EPC B by 2030 for the non-domestic private rented sector, and a 2021 consultation proposed an interim EPC C milestone in 2027. The June 2026 interim response replaced both with a targeted approach.

The government confirmed its intention that from 2031, all privately rented buildings over 1,000 square metres in England and Wales will need to reach EPC B where cost effective; that buildings below 1,000 square metres will continue to be subject to the current minimum standard of EPC E; and that the 2027 EPC C milestone will not go ahead. Existing flexibility mechanisms, including the seven-year payback test and the exemptions, remain in place.

Read this before you budget against it: the interim response is a statement of intent, not law. The changes will only take effect following the successful passage of secondary legislation through Parliament, and further detail is promised in a full government response. Plan for the direction of travel; do not treat 2031 as a fixed statutory date yet.

What the 1,000 square metre threshold means in practice

The split is the most commercially significant part of the announcement, and it changes who needs to act.

Building Standard that applies now Stated intention from 2031
Over 1,000 sq m, privately rented EPC E EPC B where cost effective, subject to legislation
Under 1,000 sq m, privately rented EPC E Remains EPC E, with no set deadline for going beyond it

For a landlord with a portfolio of high street shops and small offices, the practical message is that E remains the target and the pressure has eased. For anyone holding larger offices, warehousing or industrial space, the direction is clear and the lead time is finite — and a jump from E to B is a fabric and plant project, not a lighting swap.

The gap between those two positions is why a portfolio review is worth doing now rather than in 2030. Knowing which of your buildings cross the threshold, and what each would actually need, is cheap. Discovering it during a letting is not.

Exemptions, and the one that needs a valuer

Where a property cannot reach the standard, there are exemptions — but every one of them has to be registered on the PRS Exemptions Register before it can be relied on, and registration is what makes it effective. An unregistered exemption is not an exemption.

  • Seven-year payback: where a recommended measure’s cost is not repaid by the expected energy bill savings over seven years. You must upload three quotes from qualified installers and your cost calculations.
  • All improvements made: where every relevant improvement has been made, or there are none that can be made, and the property is still below E.
  • Wall insulation: where the only relevant improvements are cavity, external or internal wall insulation, and written expert advice shows they would negatively affect the fabric or structure.
  • Third-party consent: where consent from a tenant, superior landlord, mortgagee, freeholder or planning department cannot be obtained despite best efforts.
  • Property devaluation: where the works would reduce market value by more than 5%.
  • Recently become a landlord: a temporary six-month exemption in defined circumstances.

The devaluation exemption is the one that needs specific professional input. GOV.UK requires a report from an independent surveyor on the RICS register of valuers, advising that installing the relevant measures would reduce the market value of the property, or the building it forms part of, by more than 5%.

That is a formal valuation opinion, not a letter. It is the route most often relevant to listed and historic commercial stock, where the measures that would lift the rating are the same ones that would damage the asset. Our RICS valuation services cover this type of instruction.

Most exemptions last five years. When one expires the landlord must try again to improve the rating, or register a further exemption if one still applies. Exemptions also do not automatically pass to a new owner on sale or transfer — a point that catches buyers, and one worth raising during acquisition due diligence rather than after.

RICS registered valuer inspecting a building for a MEES property devaluation exemption report

Enforcement: who checks, and when

MEES is enforced by Local Weights and Measures Authorities. Where an authority believes a landlord may be in breach it can serve a compliance notice, and it may do so up to 12 months after the suspected breach occurred.

A compliance notice can request the EPC valid when the property was let, the tenancy agreement used, details of energy efficiency improvements made, any Energy Advice Report, and other relevant documents. Registering false or misleading information on the Exemptions Register is itself a form of non-compliance.

Separately, and often overlooked, EPCs carry their own penalty regime. GOV.UK states you can be fined between £500 and £5,000, based on the rateable value of the building, for failing to make an EPC available to a prospective buyer or tenant. EPCs are valid for ten years, which means a certificate obtained in the first wave of MEES compliance is now approaching the end of its life.

What to do in the next twelve months

The honest answer for most landlords is: less than the panic-tier articles suggest, but not nothing.

  • Confirm every EPC is current. Find the expiry dates. A lapsed certificate is a straightforward problem to fix and an awkward one to be caught by.
  • Identify anything rated F or G. That is the live compliance issue today, not 2031. Either improve it or register the right exemption.
  • Measure your floor areas. You cannot plan around a 1,000 square metre threshold without knowing which buildings sit near it.
  • Look at the recommendation reports. The EPC recommendations are the starting point for what a realistic improvement package looks like and what it would cost.
  • Time works to lease events. Fabric and plant works are far cheaper between tenancies, and a scheduled void is a better moment than a compliance deadline.

This is guidance on the regulatory position, not legal advice, and the position on the 2031 standard will firm up when legislation is laid. Where a building’s rating interacts with a lease, an exemption or a transaction, take advice on the specific property.

Need to understand where your buildings stand?

We advise commercial landlords across Lincoln, Lincolnshire and Nottinghamshire on building condition, compliance and valuation — including RICS Red Book valuation reports where a property devaluation exemption is in point. Fees are quoted per property once we know the size, use and what the instruction needs.

See our commercial property survey services, or contact the team to talk through a portfolio.

What EPC rating does a commercial property need in 2026?

At least EPC E. Since 1 April 2023 this applies to all privately rented non-domestic property in England and Wales, including existing tenancies where there has been no renewal, unless a valid exemption is registered on the PRS Exemptions Register.

Is the 2027 EPC C deadline for commercial property still happening?

No. The government’s interim response of 18 June 2026 confirmed the previously proposed interim EPC C milestone for 2027 will not be taken forward, giving landlords and tenants more time to improve their buildings in a way that suits the building and the lease.

When does EPC B apply to commercial property?

The stated intention is from 2031, for privately rented buildings over 1,000 square metres, where cost effective. Buildings below that size are intended to remain at EPC E. This will only take effect once secondary legislation passes through Parliament, so it is an intention rather than a fixed statutory date.

What happens if I let a commercial property below EPC E?

You may be in breach of the MEES Regulations. Enforcement sits with Local Weights and Measures Authorities, who can serve a compliance notice up to 12 months after a suspected breach and, where a breach is confirmed, impose a financial penalty.

Can I get an exemption if improving the building would damage its value?

Potentially. The property devaluation exemption applies where the relevant measures would reduce market value by more than 5%, evidenced by a report from an independent surveyor on the RICS register of valuers. It lasts five years and must be registered before it can be relied on.